Surveying and layout

Construction Worker · Structural Construction Worker

Being replaced

“Surveying and layout” (Construction Worker) is being replaced by AI: it entered in 2018 and is projected to be largely replaced by 2027.

AI enters
2018
Largely replaced
2027
Replacement progress
89%
Technology / key factor
Layout-marking robots

What this task is

Surveyors use total stations and chalk lines to measure the site against the drawings, marking where walls, columns, openings and pipes go directly on the floor slab.

How AI replaces it

Layout-marking robots read the BIM model, position themselves with a total station and print wall lines and points directly onto slabs, quickly and accurately. Pilots began in 2018, and most new projects are expected to use robots for layout around 2027.

What stays human

Surveyors set up control points, check the robots' layout against the design, and resolve mismatches between the drawings and actual site conditions before work proceeds.

Other Structural Construction Worker tasks

All Construction Worker tasks →